Facilities


   LAB SERVICES |    WATER TREATMENT |    DRUM STORAGE |    TANK FARM |    PROCESSING PAD |    BUILDINGS

LAB SERVICES

  • Fully equipped analytical lab
  • Several Chartered Chemists on staff
  • Provide the following analysis:
    • TCLP
    • Inorganic heavy metals
    • BTU Value, PCB analysis
    • % water, pH, Flash Testing
    • Leachate extraction, TPH
    • Volatile and semi-volatile organics
    • Waste classification according to REG 347

  • Laboratory equipment includes:
    • Gas Chromatograph Mass Spectrophotometer (GC/MS)
    • Organic compound analysis
    • Gas Chromatograph
    • ECD, FID
    • Bomb calorimeter
    • Karl Fischer, pH Meter
    • Closed cup flash point tester (Pensky-Martens)
    • Leachate extractor (for TCLP analysis)


  •    TOP

    INDUSTRIAL WATER TREATMENT

    • Physical & chemical treatment
    • Precipitation of heavy metals
    • Activated carbon treatment
    • Use modified media clay
    • Capacity for 279,898 liters

       TOP

    DRUM STORAGE

    • Licensed storage for equivalent of 1070 drums & containers
    • Indoor, temperature controlled storage area for non-flammable drums
    • Outdoor storage area for drums with flammable waste
    • All containers are labeled as per TDG regulations and LWS’ C of A


       TOP

    TANK FARM

    • ULC approved above ground tanks (11)
    • Bulk waste storage of oils, fuels, solvents, liquid organic waste and contaminated water
    • All storm water from tank farm and all other bermed areas is processed for disposal in water treatment
    • All tanks are numbered and labeled with the total capacity (liters), have sonar tank level monitoring systems, have high level alarms and are placarded in accordance to TDG regulations

       TOP

    PROCESSING PAD

    • Used to store, blend and solidify non-hazardous solid waste
    • Used to store and blend hazardous waste
    • Non-hazardous solids area consist of separate areas for effective segregation
    • All non-hazardous waste must pass the TCLP criteria (schedule 4 of Regulation 347) before being shipped out
    • Hazardous solids area consist of a separate area and strict decontamination procedures of the equipment used in this area are in place
    • Hazardous solids are shipped to a secure landfill for disposal

       TOP

    SITE OPERATION/BUILDINGS

    • Complete site consists of approximately 35,000 square feet of building on approximately seven acres of fenced, secure land
    • Facility is zoned industrial and is almost completely surrounded by rock quarries
    • Nearest residential, agricultural and irrigation areas are over 1 kilometer away
    • On-site truck scale, prints weight tickets for incoming and outgoing loads
    • Building at 5555 Power Road is our main office and the building at 5573 Power Road is used as a warehouse and storage area

       TOP


    Copyright 2008 ©LWS,    Hosted / Maintained by: ©Keynetz